4th Street|Prater Way Bus RAPID Transit Project Weekly Update: May11, 2017

4th Street|Prater Way Bus RAPID Transit Project Weekly Update: May11, 2017

Dear Stakeholder:

Below please find the project update for the week of May 8 and anticipated traffic control for the week of May 15, 2017.

 

From left to right: New projects signs throughout the corridor. Utility work continues on 4th Street.

Businesses Open During Construction!  

The RTC Project Team encourages the community to support businesses within the project corridor. This week the team installed 20 “Businesses Open During Construction” signs.  All businesses remain open with access during construction.

“This project provides important operational, safety and aesthetic improvements to the corridor,” said Warren Call, RTC Project Manager. “Our community is investing in Prater Way/4th Street and the businesses that make it unique.”

 

Traffic Control Week of May 15, 2017

Traffic control on Prater Way/4th Street between El Rancho Drive and Galletti Way includes lane reductions and a three-way stop east and westbound and at the I-80 westbound on and off ramps.  Traffic lights at I-80 eastbound on and off ramp are still functioning normally.

For the safety of drivers, riders and crews, RTC bus routes 2, 5, 11, 13, 15, 25 and 26 are detoured. Access rtcwashoe.com and click on Transit Alerts to sign up for the latest transit information. Detours will be in place throughout the summer.

Traffic control is in place on the west end of the project from Evans Avenue to Galletti Way. The south side of the roadway is closed for demolition and roadway reconstruction. Traffic is shifted to the north side of the roadway. One lane in each direction will be maintained. Business and residential access will be maintained.  Drivers can expect minor delays.

Possibly lane shifts with flagger on Prater Way between Rock Blvd. and 13th Street.

Text Alerts

Text 4prater to 797979 and you will be automatically enrolled to receive project updates and traffic controls via text message.

 Business Support

Please support your neighborhood businesses in the project corridor. Sign up to receive project updates at 4thPrater.com and you are eligible to receive a $25 gift card to a participating local business of your choice!  One gift card distributed every week during construction.

 
Stakeholder updates will be distributed weekly, and as construction operations progress.  For more information please call the project hotline at (775) 323-9335 or email Info@4thPrater.com for travel tips during construction and to sign-up to receive updates visit 4thPrater.com.

Your RTC. Our Community.