4th Street|Prater Way Bus RAPID Transit Project Weekly Update: March 24, 2017

4th Street|Prater Way Bus RAPID Transit Project Weekly Update: March 24, 2017

Dear Stakeholder:
Below please find the project update for the week of March 20 and anticipated traffic control for the week of March 27, 2017.

High Season Water Deadline Approaches

The project team is working diligently to install underground water main improvements before peak water season approaches. Demands for water increase dramatically afterMarch 31, so the team is working closely with the Truckee Meadows Water Authority (TMWA) to enhance water mains throughout the project corridor. Water demand can increase up to 400% in the summer months, mostly because of outdoor watering. To increase efficiency and reduce impacts to the community, the project team is combining utility installations wherever possible.

“We are working to meet the high-water season deadline, but we are also installing electrical and other utility enhancements at the same time,” said Warren Call, RTC Project Manager.

Corner of Prater Way and 21st Street. Minor detour begins next week.

Traffic Control Week of March 27, 2017

Drivers can expect a minor detour at Prater Way and 21st Street.  Please use 20th Street or 22nd Street.

For the safety of drivers, riders and crews, RTC bus routes 2, 25 and 26 are detoured. Access RTC Transit Services for more information. Detours will be in place throughout the summer.

The south side of the roadway is closed for demolition and roadway reconstruction from Pyramid Way west to El Rancho Drive. Businesses are still open. Traffic is shifted to the north side of the roadway. One lane in each direction will be maintained. Business and residential access will be maintained.  Drivers can expect minor delays.

Traffic control is in place on the west end of the project from Evans Avenue to Galletti Way. The south side of the roadway is closed for demolition and roadway reconstruction. Traffic is shifted to the north side of the roadway. One lane in each direction will be maintained. Business and residential access will be maintained.  Drivers can expect minor delays.

Traffic control between El Rancho Drive and Galletti Way will be set up this week and may include lane reductions.

Text Alerts

Text 4prater to 797979 and you will be automatically enrolled to receive project updates and traffic controls via text message.

Business Support

Please support your neighborhood businesses in the project corridor. Sign up to receive project updates at 4thPrater.com and you are eligible to receive a $25 gift card to a participating local business of your choice!  One gift card distributed every week during construction.

Stakeholder updates will be distributed weekly, and as construction operations progress.  For more information please call the project hotline at (775) 323-9335 or email Info@4thPrater.com for travel tips during construction and to sign-up to receive updates visit 4thPrater.com.

Your RTC. Our Community.
rtcwashoe.com