06 Feb Existing Conditions Report
The project team has completed the Existing Conditions Analysis for the 4th Street/Prater Way Corridor Study. The Analysis attempted to identify major issues, opportunities, challenges, and trends within the corridor. This Analysis also includes a summary of the first Public Open House, with the comments received being incorporated throughout the overall report. A copy of the Existing Conditions Report can be obtained from the link below: